Bahrain BAH054
Leo Lynch provided the supply, installation, testing, certification and commissioning of the mechanical/HVAC and air conditioning systems for a Bahrain data centre.
- ClientConfidential
- EngineeringRED Group
- ArchitectAECOM
- Main ContractorAbsalPaul
Project details
A complex data centre delivery project in Bahrain
The project included supply, installation, testing, certification and commissioning of the Mechanical/HVAC and Air Conditioning systems for Phase 1, Data Hall No 1. It also involved 7No full fresh AHUs with passive return dampers, with each AHU rated at approximately 52 m3/s full fresh air with a primary air supply plenum duct 3.6m x 1.8m. 14No exhaust fans located at roof level, 8No CRAC units to electrical & battery rooms, 4No 1.2mW air cooled chillers linked to a 450mm dia chilled water system were also part of the project Finally, it included fuel oil, storage and delivery system to 4No standby generators.
List of services delivered:
- Process
- Mechanical
- Lift & Shift
- Off site manufacturing
- Modular & bespoke
List of utilities delivered:
- AHUs
- Return dampers
- Air supply
- Exhaust fans
- CRAC units
- Air cooled chillers
- Chilled water system
- Fuel oil storage/delivery system